FROM REQUIREMENTS TO FINISHED GARMENTS
Garment Manufacturing Process
Follow how MYB takes your garment requirements through material sourcing, sampling, production, inspection, and packing. Understand what happens at each stage, where your input is needed, and how approved details guide the work that follows.
Discuss Your Project
Requirement Review & Material Sourcing
A useful production plan starts with a clear understanding of the garment. MYB reviews your designs, tech packs, reference samples, intended quantities, target pricing, and delivery requirements to identify what needs to be developed or clarified.
Material sourcing then connects those requirements with fabric and trim options suited to the product. Composition, weight, structure, hand feel, color, and intended use help guide the discussion.
Information to share at this stage includes:
- Design files, technical specifications, or reference garments.
- Target sizes, fit direction, and intended customer.
- Fabric preferences, trims, and branding requirements.
- Quantities by style, target pricing, and delivery needs.
For a closer look at material selection, explore our fabric sourcing service.
The aim is to establish a workable development direction and identify missing information before patterns and samples are prepared.

Pattern Making & Sample Development
Patterns translate the design into garment shapes and construction details. Samples then make those decisions tangible, giving you a garment to review before bulk production is prepared.
During sampling, the review focuses on how the elements work together:
- The silhouette, fit, and key measurements.
- Fabric behavior, appearance, and hand feel.
- Seams, pockets, closures, and other construction details.
- Label positions, decoration placement, and branding details.
Specific feedback is more useful than a general request to improve the fit. Identify the area to revise, the intended result, and any measurements or reference details that explain the change.
Our sample development service covers this evaluation stage in more detail. The feedback from sampling helps define the revisions needed before approval.
Sample Approval & Production Preparation
Once the required sample revisions have been reviewed, the approved sample and agreed specifications become the reference for bulk production. This is the point to resolve remaining questions that could otherwise lead to different interpretations during manufacturing.
Pre-production preparation brings together:
- The agreed fabric, trims, colors, and branding details.
- The approved patterns, measurements, and construction requirements.
- Production instructions and the quality expectations for the order.
The reference sample and written requirements need to describe the same product. If a comment or specification has changed during development, clarify it before production begins.
See our sample approval page for more about reviewing and confirming the reference garment.
Cutting, Sewing & Finishing
Bulk production turns the approved requirements into finished garments. The work follows the construction and finishing needs of the style, with the approved sample and production instructions providing the reference.

Cutting
Fabric is cut into the panels and components needed for the garment, following the approved pattern shapes and size requirements.

Sewing and assembly
The cut components are joined to form the garment. Seams, pockets, collars, sleeves, closures, and other details are assembled according to the specified construction.
Decoration and finishing
Printing, embroidery, washing, and other finishing processes are completed where required. Their place in the production sequence depends on the garment and the selected process.
In-line checks during production help identify workmanship or measurement issues while the order is being made. Once the required production operations are complete, finished garments move into final inspection.
Final Garment Inspection
Finished garments are checked against the approved sample and agreed order requirements. The purpose is to review the completed product before packing, including details that may be less apparent while individual production operations are still underway.
The review covers:
- Workmanship, seams, construction, and visible appearance.
- Measurements against the agreed specifications.
- Printing, embroidery, and other applied details where relevant.
- Labels and branding details required for the order.
Clear specifications make the inspection reference easier to interpret. Any requested testing, inspection method, or acceptance criteria should be discussed for the specific project rather than assumed to apply to every order.
Our production inspection page explains inspection activities in more detail.


Packing & Shipment Coordination
After final inspection, finished garments are packed according to the agreed buyer instructions and prepared for delivery. Packing brings the order together in the arrangement needed for handling, shipment, and receipt.
Requirements to confirm include:
- How garments should be folded and individually packed.
- Size and color grouping, quantity arrangements, and carton marks.
- Delivery details and any buyer-appointed logistics contacts.
MYB supports export packing and international shipment coordination. The shipment plan needs to reflect the order's readiness, destination, and agreed delivery requirements.
For more about this handover, see global shipment coordination. Freight arrangements and responsibilities should be clarified for the individual order.
Manufacturing Process FAQs
Can I start a project without a complete tech pack?
Yes. MYB can begin reviewing a project using designs, reference samples, and the information you have available. Share what is already decided and what still needs development. Measurements, construction, materials, and branding details will need to become clear enough to guide sampling and production.
Can the production sequence vary between garment styles?
Yes. The sequence depends on the garment's construction and selected processes. Printing, embroidery, washing, and finishing may need different positions in the workflow. The order of work should suit the specific style and its approved requirements.
What happens if I change a specification after sample approval?
Share the proposed change before the affected work proceeds. A change to fabric, measurements, construction, or decoration may require another review, revised instructions, or a further sample. Its effect on costs and production arrangements depends on what changes and how far the order has progressed.
What should be reviewed before repeating a previous order?
Confirm that the previous sample and specifications still represent the product you want. Review quantities, size and color breakdowns, material availability, branding, packing, and delivery requirements. Highlight any changes explicitly so they are not confused with the details of the earlier order.
What affects the overall manufacturing schedule?
The schedule depends on the scope of development, material availability, sampling and revision needs, order quantities, garment complexity, and finishing requirements. Timing for buyer feedback and approvals also matters. MYB reviews delivery requirements during the initial discussion; the applicable schedule needs to be confirmed for the specific project.